BRONKHORSPRUIT BIOGAS PLANT (PTY) LTD: NOTICE OF DRAFT EIA REPORT AVAILABILITY FOR THE PROPOSED EXPANSION OF THE EXISTING 4.6MW BRONKHORSTSPRUIT BIOGAS PLANT (“BBP”) TO 9.8MW IN BRONKHORSTSPRUIT, GAUTENG PROVINCE GDARD REFERENCE: GAUT 002/22-23/E3493

< BACK TO PUBLIC DOCUMENTATION

BRONKHORSPRUIT BIOGAS PLANT (PTY) LTD: NOTICE OF DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT AVAILABILITY FOR THE PROPOSED EXPANSION OF THE EXISTING 4.6MW BRONKHORSTSPRUIT BIOGAS PLANT (“BBP”) TO 9.8MW IN BRONKHORSTSPRUIT, GAUTENG PROVINCE

GDARD REFERENCE: GAUT 002/22-23/E3493

This gives notice to Interested and Affected Parties (“I&APs”) about the availability of the Draft Environmental Impact Assessment Report (“DEIAR”) for a 30-day public review and commenting period.

BACKGROUND TO THE PROJECT

Bronkhorstspruit Biogas Plant (Pty) Ltd (“BBP”), owned by Bio2Watt Energy Holdings (Pty) Ltd, is a renewable energy industrial facility. The existing biogas plant capacity generates 4.6 megawatts (“MW”). BBP has been supplying a private offtaker with green electricity since 2015. In 2018, BBP identified the opportunity to increase its power generation to 9.8MW. The upgrade will entail improvements to the original design and will be better positioned to process larger volumes of organic waste more efficiently.

LOCATION OF THE PROJECT

The BBP is situated on the remaining extent of the farm Boschkop 543 JR which is located 18 km south-west of Bronkhorstspruit. The proposed project is situated on the premises of one of South Africa’s largest feedlots. BBP falls under the jurisdiction of the City of Tshwane Metropolitan Municipality in the Gauteng Province.

LEGISLATIVE REQUIREMENTS

Procedure applied to the application

The proposed upgrade of the existing Biogas Plant triggers the Scoping and Environmental Impact Assessment (“S&EIA”) authorisation process, in compliance with the National Environmental Management Act, 1998 (Act No. 107 of 1998) (“NEMA”) and the NEMA Environmental Impact Assessment Regulations, 2014 (GN R982 of 4 December 2014) (“GN R982”), as amended.

Applications submitted to competent authority

The application for an Environmental Authorisation (“EA”) was submitted to the Gauteng Department of Agriculture and Rural Development (“GDARD”) on 14 June 2023.

Listed activities applied to the application

The listed activities that are being applied for include NEMA Listing Notice 1, Activity 34 and Activity 36, and Listing Notice 2, Activity 6.

PUBLIC PARTICIPATION

South Africans have a right to be informed about potential decisions that may affect them and to be afforded an opportunity to influence those decisions. This advertisement forms part of a Public Participation Process as part of the project. It describes the various components of the project to enable I&APs to get a better understanding of the potential environmental and social impacts that could be expected from the proposed project. It also outlines the process and the opportunities for the public to become involved during the study.

Availability of the draft Environmental Impact Assessment Report

The draft Environmental Impact Assessment Report will be made available to the public for review for a period of 30 days from 29 September 2023 to 30 October 2023 at the following public viewing stations:

  • Bronkhorstspruit Biogas Plant;
  • Bronkhorstspruit Community Library; and
  • Shangoni’s website (shangoni.co.za).

E-mail or fax your comments to Shangoni (details provided below) by no later than Monday, 30 October 2023.

Where to obtain more information

To obtain additional information please contact the environmental consultant at the details provided below.

Environmental Assessment Practitioner (EAP): Shangoni Management Services (Pty) Ltd

Contact person: Sameera Ismail

Tel: 012 807 7036

E-mail: sameera@shangoni.co.za

Fax: 012 807 1014

Postal Address: P. O. Box 74726, Lynnwood Ridge, 0040

+ - Draft EIA Report

To download the Draft EIA Report, please click here.